Deprecated: Creation of dynamic property Advanced_Import::$actions is deprecated in /var/www/html/wp-content/plugins/advanced-import/includes/class-advanced-import.php on line 135 Deprecated: Creation of dynamic property Advanced_Import::$filters is deprecated in /var/www/html/wp-content/plugins/advanced-import/includes/class-advanced-import.php on line 136 Deprecated: Creation of dynamic property Advanced_Import::$domain is deprecated in /var/www/html/wp-content/plugins/advanced-import/includes/class-advanced-import.php on line 139 Deprecated: Creation of dynamic property Advanced_Import::$errors is deprecated in /var/www/html/wp-content/plugins/advanced-import/includes/class-advanced-import.php on line 140 Warning: Undefined array key "url" in /var/www/html/wp-content/plugins/wpforms-lite/src/Forms/IconChoices.php on line 127 Warning: Undefined array key "path" in /var/www/html/wp-content/plugins/wpforms-lite/src/Forms/IconChoices.php on line 128 Deprecated: Creation of dynamic property ReduxFramework::$old_opt_name is deprecated in /var/www/html/wp-content/themes/eventum/admin/framework.php on line 231 Deprecated: Creation of dynamic property ReduxFramework_Extension_options_object::$field_name is deprecated in /var/www/html/wp-content/themes/eventum/admin/inc/extensions/options_object/extension_options_object.php on line 62 Deprecated: Creation of dynamic property ReduxFramework_extension_import_export::$field_name is deprecated in /var/www/html/wp-content/themes/eventum/admin/inc/extensions/import_export/extension_import_export.php on line 62 Deprecated: Creation of dynamic property ReduxFramework_extension_customizer::$upload_dir is deprecated in /var/www/html/wp-content/themes/eventum/admin/inc/extensions/customizer/extension_customizer.php on line 62 Deprecated: Creation of dynamic property ReduxFramework::$transients is deprecated in /var/www/html/wp-content/themes/eventum/admin/framework.php on line 2511 Deprecated: Creation of dynamic property ReduxFramework::$transients_check is deprecated in /var/www/html/wp-content/themes/eventum/admin/framework.php on line 2512 Deprecated: Creation of dynamic property Google\Site_Kit\Core\Authentication\Setup::$proxy_support_link_url is deprecated in /var/www/html/wp-content/plugins/google-site-kit/includes/Core/Authentication/Setup.php on line 94 Deprecated: Creation of dynamic property Google\Site_Kit\Modules\Analytics\Web_Tag::$module_slug is deprecated in /var/www/html/wp-content/plugins/google-site-kit/includes/Core/Modules/Tags/Module_Tag.php on line 42 Deprecated: Creation of dynamic property Google\Site_Kit\Modules\Analytics_4\Web_Tag::$module_slug is deprecated in /var/www/html/wp-content/plugins/google-site-kit/includes/Core/Modules/Tags/Module_Tag.php on line 42 Warning: Cannot modify header information - headers already sent by (output started at /var/www/html/wp-content/plugins/advanced-import/includes/class-advanced-import.php:135) in /var/www/html/wp-includes/feed-rss2.php on line 8 biomass power plants – REEBN https://reebn.com Regional Energy Efficiency Building Network Fri, 05 May 2023 12:59:37 +0000 en-GB hourly 1 https://wordpress.org/?v=6.2.2 Operators of biomass power plants in public institutions were trained with the support of the EU and UNDP https://reebn.com/en/operators-of-biomass-power-plants-in-public-institutions-were-trained-with-the-support-of-the-eu-and-undp-2/ Fri, 05 May 2023 12:46:53 +0000 https://reebn.com/?p=2016
Continue Reading]]>
More than 100 operators were trained in the correct management of biomass boilers, with the support of the “Addressing the impacts of the energy crisis in the Republic of Moldova” programme, financed by the European Union, and implemented by the United Nations Development Programme (UNDP) Moldova.

The trainings were organised by the Energy Efficiency Agency, in partnership with the Ministry of Infrastructure and Regional Development (MIRD) in several regions of the country and aimed at updating the knowledge of specialists that operate biomass boilers in public institutions.

The target group were the operators who have previously obtained the necessary qualifications and attended a professional training in the field of operating biomass boilers, which can be confirmed by a qualification certificate.

This activity is part of the MIRD plan to prevent and mitigate the impact of the energy crisis in case of limitation of natural gas supply and of the list of priorities for the development of the solid biomass market.

Thus, the operators studied the method of preparing the biomass boiler for the cold season, monitoring and supervision, servicing works, conservation at the end of the heating season, safety, and health rules at workplace.

In December, more than 100 biomass boilers operators were trained within the Excellence Centre in Construction and 100 biomass boilers in public institutions were inspected and verified by the experts of the “Addressing the impacts of the energy crisis in the Republic of Moldova” programme.

More than 300 solid biofuel thermal power plants are installed in public institutions in Moldova, with an installed capacity of about 70 MW. They can replace the consumption of up to 20 million m3 of natural gas per year, thus an amount of about 20 million dollars could remain in the country, at the disposal of local producers and GHG emissions will be reduced.

With a budget of €10 million, the “Addressing the impacts of the energy crisis in the Republic of Moldova” programme helps fight climate change by reducing the impact of the energy crisis and mitigating the burden of energy poverty.

]]>